Tuesday, June 23, 2009
kitchen cabinet part 6
Tuesday, June 16, 2009
big eyes' future undertakings
the other day big eyes asked me to advice her on her future occupation. told her to do what she likes best. she said she likes teaching but she wants to be rich. uh uh that means she thinks that teaching is not a lucrative job. i probed her further why she thinks so. her short answer, "i know-lah!".
hmmm.. how to help her. jokingly i told her that she can still do what she likes (i.e. teaching) and be rich at the same time. How, she retorted. Just marry a rich man. "Wow, amma, that's a GOOD IDEA! You are right!" she said snapping her fingers.
oh dear! where is this going to lead .............
bringing up kids
nowadays its not that easy to juggle with kids, career and home. wonder how many working mother can actually keep up with everything and still have time for other social activities. my only wish for this year is to be able to maintain all without much hiccups. the things i really would like to have:-
1. take care of kids' health and well being
2. guide them in their education and other activities
3. house keeping
4. retain and maintain my sanity while doing all the 3 above
hopefully it's not wishful thinking only
Monday, June 15, 2009
kitchen cabinet part 5
they came in at about 10.15 am and left around 5.00 pm. they even swept the dust off the floor.
next day woke up early had breakfast in solidarity, bought some back for home and started arranging around 10.00 am - managed to put back all the things in by about 5.00 pm. TG swept and mopped the ground floor again. it's still not in order but better than earlier.
neway, the kc contractor will come back either this or next saturday to install the cabinet doors and varnish the whole thing. the kitchen suddenly looks so tall & huge coz the cabinets are right up to the top with the top most part a fake wall.
Thursday, June 11, 2009
what's behind my blog name
kitchen cabinet part 4
end march : more or less confirmed the kc contractor
13 april 2009 : quote finalised by kc contractor for kitchen cabinet, study table cum book rack& shoe rack at the porch
27 april 2009 : paid deposit
29 may 2009 : installed the study table (delayed by 2 weeks from the promised 11-15 may week)
13 june 2009 : installation of the kitchen cabinet body (no doors yet) (tentatively)
27 june 2009 : installation of the doors (tentatively)
and this timeline is with me doing the designing and highlighting things to the kc contractor.
oh, and don't forget that i was the one who sourced for the door handles, bought them and arranged for the drilling of hood ducting hole.
so the kitchen saga still continues for another round...............
the kutties are back!
so they dropped by at the office just now and i went out for a quick look - syama just couldn't help but touch my cheeks - this gesture spoke more than a thousand words. what wonderful loving kids and family i have. may god bless them always.......ohm
